Summary for Test 2021-07-21-59-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 214466 DEA: 081F1414 EFIS: 0815000231 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15-15-54.2/54.3 |
Award Date | 01/02/2020 |
Closeout Date | 05/26/2022 |
Work Description | Slab & lane replacement with JPCP & precast conc pavement, place HMA. |
Location Description | Riverside and San Diego County |
QA Service Level | 1 (Verified on 03/20/2020) |
Sample Information
Sample Taken Date | 07/21/2021 | Sample Unique Key | 59 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/22/2021 |
Sample type | Quality Assurance | A brief description of the sample | 3/4 RHMA-G 1/2" |
The quantity of what the sample constitutes | 1Bag | From where was the sample collected | Distributor |
First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | o |
Title of sampler | Consultant | Telephone number of sampler | |
Laboratory sample identification | test 1 214 tons out | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CCA-Lake Elsinore | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | |
Sublot number | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2021-07-21-59
DIME Test ID: 2021-07-21-59-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-09-22
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: samil el chammas
Date of test: 07/22/2021
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 93 %
Cumulative percent passing the 3/8 in. sieve: 80 %
Cumulative percent passing the #4 sieve: 38 %
Cumulative percent passing the #8 sieve: 28 %
Cumulative percent passing the #16 sieve: 18 %
Cumulative percent passing the #30 sieve: 12 %
Cumulative percent passing the #50 sieve: 8 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 4.0 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/22/2021 ✔