Summary for Test 2013-08-09-9002996-1
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 3825 DEA: 07138204 EFIS: 0700000142 |
---|---|
DIST-CO-RTE-PM | 07-LA-47,103-3.5/4.6,0.0/1.1 |
Award Date | 06/30/2011 |
Closeout Date | 07/14/2022 |
Work Description | REPLACE STEEL BRIDGE WITH CIP PS CONCRETE BOX GIRDER BRIDGE AND RAMPS. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AND LOS ANGELES ON ROUTE 47 FROM OCEAN BOULEVARD TO ROUTE 103 JUNCTION AND ON ROUTE 103 FROM ROUTE 47 JUNCTION TO ANAHEIM STREET OVERHEAD |
QA Service Level | 1 (Verified on 03/29/2012) |
Sample Information
Sample Taken Date | 08/09/2013 | Sample Unique Key | 9002996 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/16/2013 |
Sample type | Department Acceptance | A brief description of the sample | Soil for structure backfill. |
The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Not set | Telephone number of sampler | Not set |
Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | None | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | NA |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Soil for structure backfill. | The fabricator/manufacturer designation for the sample | Not set |
The plant number | Not set | A detailed description of where the material sample was collected | Stockpile |
Where the material sample would have been placed if not sampled | Not set | Primary Aggregate Nominal Size | |
The concrete mix design number | Lot number | Not set | |
Sublot number | Not set | Aggregate Mix Number | Not set |
Combined Gradation Report Information
Combined Gradation Report Id | Bin Index | Dime Test Id |
---|---|---|
No assigned tests for this sample. |
Test Details
DIME Sample ID: 2013-08-09-9002996
DIME Test ID: 2013-08-09-9002996-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2015-02-19
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Matthew Clayton
Date of test: 08/23/2013
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 93 %
Cumulative percent passing the #8 sieve: 79 %
Cumulative percent passing the #16 sieve: 60 %
Cumulative percent passing the #30 sieve: 41 %
Cumulative percent passing the #50 sieve: 26 %
Cumulative percent passing the #100 sieve: 16 %
Cumulative percent passing the #200 sieve: 11 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/19/2015 ✔