Summary for Test 2021-08-23-26-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215530 DEA: 051N1704 EFIS: 0520000136 |
---|---|
DIST-CO-RTE-PM | 05-SB-135-1.0/R7.2 |
Award Date | 04/12/2021 |
Closeout Date | 05/24/2022 |
Work Description | Construct pavement using partial depth recycling and pave with RHMA |
Location Description | CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY NEAR LOS ALAMOS FROM 0.3 MILE NORTH OF DEN STREET TO SAN ANTONIO CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/16/2021) |
Sample Information
Sample Taken Date | 08/23/2021 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/31/2021 |
Sample type | Department Acceptance | A brief description of the sample | Asphalt Binder PG 64-10 |
The quantity of what the sample constitutes | 2 cans - load 1 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | G | Last name of sampler or witnessed by | Alvarez |
Title of sampler | Consultant | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Granite Construction | Transportation Laboratory (TL) Number | 023703 copy |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | 3 |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | Granite Construction | |
Certified Asphalt Supplier | Valero Marketing & Supply - Wilmington CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-23-26
DIME Test ID: 2021-08-23-26-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-14
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/06/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 176.859 grams
Mass of empty container #2: 168.133 grams
Mass of container #1 before test (m1i): 213.081 grams
Mass of container #2 before test (m2i): 203.343 grams
Mass of container #1 after test (m1f): 212.931 grams
Mass of container #2 after test (m2f): 203.194 grams
Average mass change: -0.419 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 9/14/2021 ✔