Summary for Test 2021-07-21-39-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Sample Information

Sample Taken Date07/21/2021 Sample Unique Key39
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/21/2021
Sample typeQuality Control A brief description of the sampleFine Aggregate
The quantity of what the sample constitutes1 Day of Production From where was the sample collectedSource
First name of sampler or witnessed byCoby Last name of sampler or witnessed byHarris
Title of sampler Telephone number of sampler
Laboratory sample identification233229 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCemex Cordelia Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2021-07-21-39
DIME Test ID: 2021-07-21-39-1
Testing Lab: Construction Testing Services
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-08-05

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Individual Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Corry Blue
Date of test: 07/28/2021
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 99 %
Cumulative percent passing the #8 sieve: 87 %
Cumulative percent passing the #16 sieve: 65 %
Cumulative percent passing the #30 sieve: 46 %
Cumulative percent passing the #50 sieve: 21 %
Cumulative percent passing the #100 sieve: 6.8 %
Cumulative percent passing the #200 sieve: 2.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/5/2021