Summary for Test 2021-07-19-34-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 215350
DEA: 081E0604
EFIS: 0813000140
DIST-CO-RTE-PM08-SBD-18-97.0/99.5
Award Date02/23/2021
Closeout Date01/23/2023
Work DescriptionWIDEN ROADWAY WITH HMA, MINOR CONCRETE & MODIFY SIGNAL & LIGHTING.
Location DescriptionSAN BERNARDINO COUNTY IN VICTORVILLE FROM AMARGOSA ROAD TO COBALT ROAD
QA Service Level1 (Verified on 06/23/2021)

Sample Information

Sample Taken Date07/19/2021 Sample Unique Key34
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/20/2021
Sample typeQuality Assurance A brief description of the sample3/4 HMA-SP Type A
The quantity of what the sample constitutes1Bag From where was the sample collectedManufacturer
First name of sampler or witnessed byAlex Last name of sampler or witnessed byb/d
Title of samplerTET Telephone number of sampler
Laboratory sample identificationsublot 2 Linked DIME Sample ID
The fabricator/manufacturer/facility nameBlue Diamond-Victorville Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name60 tons out at 719 am

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number2 HMA Mix NumberNot set

Test Details

DIME Sample ID: 2021-07-19-34
DIME Test ID: 2021-07-19-34-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-07-30

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: dizhou ou
Date of test: 07/28/2021
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 97 %
Cumulative percent passing the 1/2 in. sieve: 89 %
Cumulative percent passing the 3/8 in. sieve: 76 %
Cumulative percent passing the #4 sieve: 56 %
Cumulative percent passing the #8 sieve: 45 %
Cumulative percent passing the #16 sieve: 33 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 13 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 3.7 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/30/2021