Summary for Test 2021-07-15-21-4
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215607 DEA: 061C6504 EFIS: 0621000099 |
---|---|
DIST-CO-RTE-PM | 06-FRE-41-R0.5/M5.9 |
Award Date | 05/04/2021 |
Closeout Date | 05/04/2022 |
Work Description | RESURFACE AC PAVEMENT AND INSTALL MEDIAN TYPE K CONCRETE BARRIER. |
Location Description | FRESNO COUNTY ABOUT 6 MILES NORTH OF LEMOORE FROM 0.5 MILE NORTH OF EXCELSIOR AVENUE UNDERCROSSING TO 0.2 MILE SOUTH OF ELKHORN AVENUE |
QA Service Level | 1 (Verified on 03/29/2021) |
Sample Information
Sample Taken Date | 07/15/2021 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/20/2021 |
Sample type | Department Acceptance | A brief description of the sample | BINDER 64-16 |
The quantity of what the sample constitutes | 1 OF 1 CAN | From where was the sample collected | Source |
First name of sampler or witnessed by | Rick | Last name of sampler or witnessed by | Granite Tech |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Joaquin Refining Co Inc | Transportation Laboratory (TL) Number | 039897 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | 2 |
Sublot number | 13 | Tank number | |
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-07-15-21
DIME Test ID: 2021-07-15-21-4
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-07-28
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 07/25/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.664 grams
Mass of empty container #2: 181.943 grams
Mass of container #1 before test (m1i): 210.225 grams
Mass of container #2 before test (m2i): 217.814 grams
Mass of container #1 after test (m1f): 210.135 grams
Mass of container #2 after test (m2f): 217.720 grams
Average mass change: -0.258 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 7/28/2021 ✔