Summary for Test 2021-05-15-3-3

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date05/15/2021 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing05/15/2021
Sample typeQuality Control A brief description of the sample3/8-inch RAP
The quantity of what the sample constitutes3 bags From where was the sample collectedSupplier
First name of sampler or witnessed byGraco Last name of sampler or witnessed byGraco
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Pleasanton Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceStockpile@Plant
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-05-15-3
DIME Test ID: 2021-05-15-3-3
Testing Lab: Granite Construction Company - Coastal
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-07-09

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Kleinfelder
Date of test: 05/15/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 84 %
Cumulative percent passing the #8 sieve: 61 %
Cumulative percent passing the #16 sieve: 46 %
Cumulative percent passing the #30 sieve: 34 %
Cumulative percent passing the #50 sieve: 23 %
Cumulative percent passing the #100 sieve: 15 %
Cumulative percent passing the #200 sieve: 9.6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/9/2021