Summary for Test 2021-06-08-19-2

Test performed: CTM 301-March 2000

Project Information

Project IdentifiersProject ID: 215245
DEA: 021J4504
EFIS: 0220000080
DIST-CO-RTE-PM02-SIS-89-14.0/19.0
Award Date12/08/2020
Closeout Date09/27/2021
Work DescriptionPLACE HMA (TYPE A).
Location DescriptionSISKIYOU COUNTY ABOUT 6 MILES NORTH OF BARTLE FROM 0.4 MILE NORTH OF EDISON CREEK ACCESS ROAD TO 2.0 MILES SOUTH OF MUD CREEK BRIDGE
QA Service Level1 (Verified on 10/23/2020)

Sample Information

Sample Taken Date06/08/2021 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/08/2021
Sample typeAcceptance A brief description of the sampleShoulder Backing
The quantity of what the sample constitutesUp to 3000 tons From where was the sample collectedManufacturer
First name of sampler or witnessed byJohn Last name of sampler or witnessed byCarmichael
Title of samplerConsultant Telephone number of sampler
Laboratory sample identificationD78836 Linked DIME Sample ID
The fabricator/manufacturer/facility nameFawndale Rock and Asphalt - Redding, CA Transportation Laboratory (TL) Number779373
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-45-0017
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled02 SIS 89 Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-06-08-19
DIME Test ID: 2021-06-08-19-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2021-12-02

Test Results


How will the R value be determined?: By stabilometer
Input Type: Measured
Tester's full name: Terry McCormick
Date of test: 06/16/2021
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 96 %
As Received Gradation, Percent Passing 3/4 in. sieve: 86 %
As Received Gradation, Percent Passing 1/2 in. sieve: 72 %
As Received Gradation, Percent Passing 3/8 in. sieve: 63 %
As Received Gradation, Percent Passing #4 sieve: 47 %
As Received Gradation, Percent Passing #8 sieve: 35 %
As Received Gradation, Percent Passing #16 sieve: 25 %
As Received Gradation, Percent Passing #30 sieve: 19 %
As Received Gradation, Percent Passing #50 sieve: 16 %
As Received Gradation, Percent Passing #100 sieve: 13 %
As Received Gradation, Percent Passing #200 sieve: 11 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 84 %
As Used Gradation, Percent Passing 3/8 in. sieve: 74 %
As Used Gradation, Percent Passing #4 sieve: 54 %
As Used Gradation, Percent Passing #8 sieve: 40 %
As Used Gradation, Percent Passing #16 sieve: 29 %
As Used Gradation, Percent Passing #30 sieve: 22 %
As Used Gradation, Percent Passing #50 sieve: 18 %
As Used Gradation, Percent Passing #100 sieve: 15 %
As Used Gradation, Percent Passing #200 sieve: 12 %
Horizontal pressure (specimen 1): 0.1 MPa
Displacement (specimen 1): 4.25
Horizontal pressure (specimen 2): 0.14 MPa
Displacement (specimen 2): 4.57
Horizontal pressure (specimen 3): 0.17 MPa
Displacement (specimen 3): 4.06
R value (specimen 1): 85.5
R value (specimen 2): 79
R value (specimen 3): 77.1
R value: 77
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/2/2021