Summary for Test 2021-06-03-18-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 215424 DEA: 024G4404 EFIS: 0214000013 |
---|---|
DIST-CO-RTE-PM | 02-SIS-3-38.0/38.6 |
Award Date | 04/05/2021 |
Closeout Date | 08/14/2023 |
Work Description | BRIDGE REPLACEMENT |
Location Description | SISKIYOU COUNTY ABOUT 6 MILES NORTH OF FORT JONES FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF LOWER MOFFETT CREEK ROAD |
QA Service Level | 1 (Verified on 01/19/2021) |
Sample Information
Sample Taken Date | 06/03/2021 | Sample Unique Key | 18 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/03/2021 |
Sample type | Department Acceptance | A brief description of the sample | Combined RAP (1/2-inch) |
The quantity of what the sample constitutes | PSE at 395 Tons | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | D. | Last name of sampler or witnessed by | Owens |
Title of sampler | PEI | Telephone number of sampler | |
Laboratory sample identification | D78823 | Linked DIME Sample ID | 2021-06-03-17 |
The fabricator/manufacturer/facility name | Tullis Inc - Northstate Asphalt - Redding, CA | Transportation Laboratory (TL) Number | 779366 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Tullis, Northstate Asphalt |
---|---|---|---|
Aggregate Size | 1/2-inch | Aggregate Source | Unknown |
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-06-03-18
DIME Test ID: 2021-06-03-18-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-08-27
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: terry McCormick
Date of test: 06/04/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.34 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/27/2021 ✔