Summary for Test 2021-05-14-26-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 212496 DEA: 024E4504 EFIS: 0200020286 |
---|---|
DIST-CO-RTE-PM | 02-LAS,MOD-139,299-VAR |
Award Date | 07/28/2020 |
Closeout Date | 08/14/2023 |
Work Description | PLACE HMA, REPLACE DRAINAGE, CULVERT, ELECTRICAL AND LIGHTING SYSTEMS. |
Location Description | LASSEN AND MODOC COUNTIES ON ROUTE 139 AT 0.1 MILE NORTH OF LASSEN COUNTY LINE AND ON ROUTE 299 AT VARIOUS LOCATONS FROM 0.4 MILE WEST OF BOYD HILL LOOKOUT ROAD TO 0.6 MILE EAST OF COUNTY ROAD 87 |
QA Service Level | 1 (Verified on 06/06/2017) |
Sample Information
Sample Taken Date | 05/14/2021 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/28/2021 |
Sample type | Department Acceptance | A brief description of the sample | PG58-34M |
The quantity of what the sample constitutes | 2 cans | From where was the sample collected | Source |
First name of sampler or witnessed by | E | Last name of sampler or witnessed by | Chavez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Albina - Klamath Falls, OR | Transportation Laboratory (TL) Number | 765848 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | Hat Creek - Shaw Pit Facility | |
Certified Asphalt Supplier | Albina Asphalt - Klamath Falls Plant - Klamath Falls OR | Multigrade | No |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-05-14-26
DIME Test ID: 2021-05-14-26-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-06-07
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 06/02/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 169.990 grams
Mass of empty container #2: 170.771 grams
Mass of container #1 before test (m1i): 206.349 grams
Mass of container #2 before test (m2i): 208.258 grams
Mass of container #1 after test (m1f): 206.191 grams
Mass of container #2 after test (m2f): 208.134 grams
Average mass change: -0.383 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 6/7/2021 ✔