Summary for Test 2021-04-20-22-3
Test performed: CTM 524-March 2013Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Sample Information
Sample Taken Date | 04/20/2021 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/21/2021 |
Sample type | Department Acceptance | A brief description of the sample | Concrete beams |
The quantity of what the sample constitutes | 3 beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | RMA | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 86-2A, 86-2B, 86-2C | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RV Concrete Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | RVC-60-3 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | TT1 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | On Job Site at Concrete Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-04-20-22
DIME Test ID: 2021-04-20-22-3
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2021-05-10
Test Results
Number of specimens: 1
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: No
Input Type: Calculated
Tester's full name: M. Warde
Date of test: 04/30/2021
Identification number: 86-2C
Width of specimen: 6 inch
Depth of specimen: 6.0625 inch
Span length of specimen: 18 inch
Maximum load applied: 7930 lb
Curing history and apparent moisture condition of the specimen: sand pit
If specimen was capped, ground or if leather shims were used: no
Defects in specimen, including numbers of beams discarded during test: none
Age of specimen: 10 days
Age of specimen in hours: no data
Modulus of rupture: 680 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/10/2021 ✔