Summary for Test 2021-04-01-26-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 212914 DEA: 031E0604 EFIS: 0312000068 |
---|---|
DIST-CO-RTE-PM | 03-YUB-70-15.5/16.5 |
Award Date | 07/31/2019 |
Closeout Date | 08/30/2023 |
Work Description | SIMMERLY SLOUGH BRIDGE REPLACEMENT BR 16-0019 WITH BR 16-0055. |
Location Description | NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE BR 16-0019. |
QA Service Level | 1 (Verified on 08/22/2019) |
Sample Information
Sample Taken Date | 04/01/2021 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/01/2021 |
Sample type | Verification | A brief description of the sample | RAP minus 1/2" |
The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Teichert Personnel (SAMPLER) | Last name of sampler or witnessed by | Brad McKeehan (WITNESS) |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | JMF21-020A | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Teichert-Hallwood Drum Plant | Transportation Laboratory (TL) Number | C706328 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Not Applicable |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Hallwood, RAP Bin 1 |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Static | Stockpile Size (tons) | Unknown |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-04-01-26
DIME Test ID: 2021-04-01-26-1
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-05-05
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Mario Munoz
Date of test: 01/13/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.55 %
General comments (publicly viewable) (Max 1000 characters): JMF21-020A.
Test was verified on 5/5/2021 ✔