Summary for Test 2021-03-12-14-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 214900
DEA: 034F8104
EFIS: 0314000291
DIST-CO-RTE-PM03-GLE-32-L0.0/R0.3,0.1/0.9
Award Date06/15/2020
Closeout Date06/29/2021
Work DescriptionCONSTRUCT SIDEWALKS, CURB RAMPS, & DRIVEWAYS.
Location DescriptionGLENN COUNTY IN ORLAND AT VARIOUS LOCATIONS FROM ROUTE 5 SOUTHBOUND OFF RAMP TO ROUTE 32 TO NINTH STREET/TEHAMA STREET AND FROM FOURTH STREET TO WOODWARD AVENUE
QA Service Level1 (Verified on 04/15/2020)

Sample Information

Sample Taken Date03/12/2021 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/12/2021
Sample typeVerification A brief description of the sampleRAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byBrad McKeehan (WITNESS) Last name of sampler or witnessed byKRC Personnel (SAMPLER)
Title of sampler Telephone number of sampler
Laboratory sample identificationJMF21-003 Linked DIME Sample ID
The fabricator/manufacturer/facility nameKnife River Construction - Orland Drum Plant Transportation Laboratory (TL) NumberC778174
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceKRC Orland
Aggregate Size Aggregate Source
RAP StockpileContinuous Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-03-12-14
DIME Test ID: 2021-03-12-14-1
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-04-01

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: KRC Personnel
Date of test: 12/07/2020
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.79 %
General comments (publicly viewable) (Max 1000 characters): JMF21-003. KRC Personnel

Test was verified on 4/1/2021