Summary for Test 2021-03-17-29-1

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/22/2020
Closeout Date12/11/2023
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date03/17/2021 Sample Unique Key29
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/30/2021
Sample typeQuality Assurance A brief description of the sampleHRC 500/510 Couplers
The quantity of what the sample constitutes150 From where was the sample collectedJob Site
First name of sampler or witnessed byJosh Last name of sampler or witnessed byMadrigal
Title of samplerASR Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar Transportation Laboratory (TL) NumberC761569
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#14 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)73118000, 74118343 Rebar Heat Number(s)3101016
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2021-03-17-29
DIME Test ID: 2021-03-17-29-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-03-30

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 03/30/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID: Large
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11No. 14/43mm1-0.01282.2520990393290OK Neckingfsaylor

General comments (publicly viewable) (Max 1000 characters): OK Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 3/30/2021