Summary for Test 2021-03-17-29-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
Award Date | 10/22/2020 |
Closeout Date | 12/11/2023 |
Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
Sample Taken Date | 03/17/2021 | Sample Unique Key | 29 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/30/2021 |
Sample type | Quality Assurance | A brief description of the sample | HRC 500/510 Couplers |
The quantity of what the sample constitutes | 150 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Josh | Last name of sampler or witnessed by | Madrigal |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Rebar | Transportation Laboratory (TL) Number | C761569 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
Rebar Size | #14 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 73118000, 74118343 | Rebar Heat Number(s) | 3101016 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-03-17-29
DIME Test ID: 2021-03-17-29-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-03-30
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 03/30/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID: Large
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 1 | No. 14/43mm | 1 | -0.0128 | 2.25 | 209903 | 93290 | OK Necking | fsaylor |
General comments (publicly viewable) (Max 1000 characters): OK Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 3/30/2021 ✔