Summary for Test 2021-03-23-3-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 99999 DEA: 0322222 |
---|---|
DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
QA Service Level | (Verified on 04/05/2013) |
Sample Information
Sample Taken Date | 03/23/2021 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/24/2021 |
Sample type | Quality Control | A brief description of the sample | 1 |
The quantity of what the sample constitutes | 1 | From where was the sample collected | Source |
First name of sampler or witnessed by | 1 | Last name of sampler or witnessed by | 111 |
Title of sampler | 1 | Telephone number of sampler | 123456789 |
Laboratory sample identification | 1 | Linked DIME Sample ID | 11 |
The fabricator/manufacturer/facility name | 1 | Transportation Laboratory (TL) Number | 11 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
---|---|---|---|
Modified | Lot number | ||
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-03-23-3
DIME Test ID: 2021-03-23-3-1
Testing Lab: Veleroo - Coolidge
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-03-23
Test Results
Is mass change based on one or two containers?: One
Input Type: Calculated
Tester's full name: Binder Lab Tester 1
Date of test: 03/23/2021
Average mass change: 23 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/23/2021 ✔