Summary for Test 2015-05-28-5-1

Test performed: ASTM C1064-12

Project Information

Project IdentifiersProject ID: 209141
DEA: 07215954
EFIS: 0700001835
DIST-CO-RTE-PM07-LA-5-0.0/7.6
Award Date04/24/2014
Closeout Date07/14/2022
Work DescriptionWIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location DescriptionLOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
QA Service Level1 (Verified on 06/02/2014)

Sample Information

Sample Taken Date05/28/2015 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/28/2015
Sample typeQuality Control A brief description of the sampleCylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byJerid Last name of sampler or witnessed byKupelian
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility namejob site Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierUnknown
Structure nameUnknown

Material Information

Material TypeConcrete The concrete mix design number1536953
The truck number from where the sample was collectedUnknown The batch plant ticket number from where the sample was collected1
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedCIDH Piles Where the material sample would have been placed if not sampledUnknown
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2015-05-28-5
DIME Test ID: 2015-05-28-5-1
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: ASTM C1064-12: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2015-10-21

Test Results


Input Type: Calculated
Tester's full name: Jerid Kupelian
Date of test: 05/28/2015
Temperature: 74 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/21/2015