Summary for Test 2013-07-16-7154236-1
Test performed: CTM 504-June 2010Project Information
Project Identifiers | Project ID: 8127 DEA: 080N5904 EFIS: 0800000533 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R85.2 |
Award Date | 02/07/2013 |
Closeout Date | 05/11/2015 |
Work Description | CONSTRUCT PC/PS BULB-TEE GIRDER BRIDGE |
Location Description | SAN BERNARDINO COUNTY NEAR ESSEX AT VAN WINKLE WASH BRIDGE |
QA Service Level | 1 (Verified on 12/10/2012) |
Sample Information
Sample Taken Date | 07/16/2013 | Sample Unique Key | 7154236 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2013 |
Sample type | Quality Control | A brief description of the sample | concrete cylinders |
The quantity of what the sample constitutes | 4 cylinders | From where was the sample collected | Source |
First name of sampler or witnessed by | Jared | Last name of sampler or witnessed by | Tietjen |
Title of sampler | Field Technician | Telephone number of sampler | Not set |
Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | High Grade | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Concrete | The concrete mix design number | HG53401R |
---|---|---|---|
The truck number from where the sample was collected | 193 | The batch plant ticket number from where the sample was collected | 810669 |
Concrete batch plant | Not set | The fabricator/manufacturer designation for the sample | Not set |
A detailed description of where the material sample was collected | Bent no. 2 - North Column Pad - 1st Lift | Where the material sample would have been placed if not sampled | Not set |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2013-07-16-7154236
DIME Test ID: 2013-07-16-7154236-1
Testing Lab: SCST, LLC
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2013-07-24
Test Results
Input Type: Calculated
Tester's full name: Jared Tietjen
Date of test: 07/16/2013
Air Content: 0.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/24/2013 ✔