Test 2020-05-20-16-4 (CTM 518-June 2010) Summary

Project Information
Project IdentifiersProject ID: 214292
DEA: 060Q9004
EFIS: 0614000047
DIST-CO-RTE-PM06-FRE-180-92.2,130.1
Work DescriptionREPLACE BRIDGE RAILS.
Location DescriptionFRESNO COUNTY NEAR SQUAW VALLEY AT MILL CREEK BRIDGE AND NEAR BOYDEN CAVE AT SOUTH FORK KINGS RIVER BRIDGE
Sample Information
Sample Taken Date5/20/2020 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing5/20/2020
Sample typeQuality Control A brief description of the samplePCC
The quantity of what the sample constitutestwo cylinders From where was the sample collectedOther
First name of sampler or witnessed byMatthew Last name of sampler or witnessed byHorn
Title of samplerQC Technician Laboratory sample identification
The fabricator/manufacturer/facility nameOutback Materials Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeConcrete The concrete mix design number72T1X10
The truck number from where the sample was collected104 The batch plant ticket number from where the sample was collected78360
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedUnknown Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown
Test Details
DIME Sample ID: 2020-05-20-16
DIME Test ID: 2020-05-20-16-4
Testing Lab: Trinity Engineering Laboratories, Inc. - Fresno
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2020-05-29
Test Results

Input Type: Calculated
Tester's full name: Matthew Horn
Date of test: 05/20/2020
Calibration factor: 4
Weight of (Measure + Concrete + Cover Plate): 46 lb
Weight of (Measure + Cover Plate): 7.5 lb
Total weight of cement: 575 lb
Total weight of fine aggregate: 1269 lb
Total weight of coarse aggregate: 1732 lb
Total weight of water added during mixing: 301.3 lb
Kelly Ball Penetration of the batch of concrete tested: 3.5 inch
Air content by the pressure method: 1.5 %
Station number or portion of the structure in which the concrete was placed: 0
Unit weight of the concrete:154 lb/ft^3
Volume of the concrete:8 yd^3
Cement content:7.18 lb/yd^3
General comments (publicly viewable) (Max 250 characters):

Test was verified on 05/29/2020