Test 2019-12-19-29-1 (CTM 202-November 2011) Summary
Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 | ||
---|---|---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 | ||
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. | ||
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
Sample Information
Sample Taken Date | 12/19/2019 | Sample Unique Key | 29 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/23/2019 |
Sample type | Acceptance | A brief description of the sample | 3/8" PCC AGGREGATE |
The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Distributor |
First name of sampler or witnessed by | TUAN A | Last name of sampler or witnessed by | NGUYEN |
Title of sampler | MREA | Laboratory sample identification | 9047 |
The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | CTNT1 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA or name of Pit) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Unknown |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/8 inch |
The concrete mix design number | G3-19-PCC-001 | Lot number | Unknown |
Sublot number | Unknown | HMA Design ID |
Test Details
DIME Sample ID: 2019-12-19-29
DIME Test ID: 2019-12-19-29-1
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-03-19
Test Results
What size aggregate is being tested?: 0.375 in x No. 8 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: LARRY DIAZ
Date of test: 12/27/2019
Cumulative percent passing the 1/2 in. sieve:100 %
Cumulative percent passing the 3/8 in. sieve:96 %
Cumulative percent passing the #4 sieve:20 %
Cumulative percent passing the #8 sieve:2.6 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 03/19/2020 ✔