Test 2019-10-18-12-1 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 214706
DEA: 120M8204
EFIS: 1214000041
DIST-CO-RTE-PM12-ORA-1-7.9/10.5
Work DescriptionNot set
Location DescriptionNot set
Sample Information
Sample Taken Date10/18/2019 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/29/2019
Sample typePreliminary A brief description of the sampleSOIL SAMPLE OF SUBGRADE 2'-4' DEPTH
The quantity of what the sample constitutes1 BAG From where was the sample collectedJob Site
First name of sampler or witnessed byJOSE Last name of sampler or witnessed byMENDEZ
Title of samplerTET Laboratory sample identification8770
The fabricator/manufacturer/facility nameNATIVE SOIL Transportation Laboratory (TL) NumberC936702
Inspector Lot Number from the Transportation Laboratory (TL) FormMB-05 Structure unique identifier
Structure name
Material Information
Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedSR-01 PCH MB-05
Where the material sample would have been placed if not sampledUnknown
Test Details
DIME Sample ID: 2019-10-18-12
DIME Test ID: 2019-10-18-12-1
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-03-18
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Jose Mendez
Date of test: 10/29/2019
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:99 %
Cumulative percent passing the 3/4 in. sieve:98 %
Cumulative percent passing the 1/2 in. sieve:96 %
Cumulative percent passing the 3/8 in. sieve:95 %
Cumulative percent passing the #4 sieve:93 %
Cumulative percent passing the #8 sieve:91 %
Cumulative percent passing the #16 sieve:89 %
Cumulative percent passing the #30 sieve:85 %
Cumulative percent passing the #50 sieve:77 %
Cumulative percent passing the #100 sieve:62 %
Cumulative percent passing the #200 sieve:47 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 03/18/2020