Test 2019-07-22-42-1 (CTM 203-February 2008) Summary

Project Information
Project IdentifiersProject ID: 214698
DEA: 120N8904
EFIS: 1214000130
DIST-CO-RTE-PM12---
Work DescriptionNot set
Location DescriptionNot set
Sample Information
Sample Taken Date7/22/2019 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/15/2019
Sample typePreliminary A brief description of the sampleNATIVE SOIL 35' DEPTH
The quantity of what the sample constitutes1 BAG From where was the sample collectedJob Site
First name of sampler or witnessed byBALA Last name of sampler or witnessed byKRISH
Title of sampler TE CIVIL Laboratory sample identification8857
The fabricator/manufacturer/facility nameNATIVE Transportation Laboratory (TL) NumberBULK
Inspector Lot Number from the Transportation Laboratory (TL) FormR-19-001 S-7 Structure unique identifier
Structure nameRTE 133 PM 8 5 PM 9 3
Material Information
Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedRTE 133 PM 8.5 -9.3
Where the material sample would have been placed if not sampledUnknown
Test Details
DIME Sample ID: 2019-07-22-42
DIME Test ID: 2019-07-22-42-1
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2020-03-13
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: TESS PEREZ
Date of test: 11/25/2019
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:100 %
Cumulative percent passing the 1/2 in. sieve:100 %
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the #4 sieve:100 %
Cumulative percent passing the #8 sieve:93 %
Cumulative percent passing the #16 sieve:78 %
Cumulative percent passing the #30 sieve:58 %
Cumulative percent passing the #50 sieve:41 %
Cumulative percent passing the #100 sieve:30 %
Cumulative percent passing the #200 sieve:24 %
Cumulative Percent Passing on 1 Micron:13 %
Cumulative Percent Passing on 5 Microns:16 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 03/13/2020