Test 2014-08-30-4-3 (ASTM C136-06) Summary

Project Information
Project IdentifiersProject ID: 209175
DEA: 030F2204
EFIS: 0300000072
DIST-CO-RTE-PM03-ED-50-R30.7/R31.7
Work DescriptionREPLACE BRIDGE.
Location DescriptionSLY PARK UNDERCROSSING
Sample Information
Sample Taken Date8/30/2014 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/30/2014
Sample typeQuality Control A brief description of the sampleStage 2 Abutment 2 Footing
The quantity of what the sample constitutes1 bag From where was the sample collectedSource
First name of sampler or witnessed byAndrew Last name of sampler or witnessed bySantos
Title of samplerUnknown Laboratory sample identificationUnknown
The fabricator/manufacturer/facility nameFolsom Ready Mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)Stage 2 Abutment 2 Footing
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedFolsom Ready Mix Stockpile
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size
The concrete mix design number Lot numberNot set
Sublot numberNot set HMA Design ID
Test Details
DIME Sample ID: 2014-08-30-4
DIME Test ID: 2014-08-30-4-3
Testing Lab: Viking Construction Company, Inc. - Rancho Cordova
Test Method: ASTM C136-06: Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2014-09-17
Test Results

What type of gradation is being tested?: Combined Gradation
Input Type: Calculated
Tester's full name: Andrew Santos
Date of test: 08/30/2014
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:96 %
Cumulative percent passing the 1/2 in. sieve:79 %
Cumulative percent passing the 3/8 in. sieve:63 %
Cumulative percent passing the #4 sieve:44 %
Cumulative percent passing the #8 sieve:37 %
Cumulative percent passing the #16 sieve:30 %
Cumulative percent passing the #30 sieve:17 %
Cumulative percent passing the #50 sieve:7 %
Cumulative percent passing the #100 sieve:3 %
Cumulative percent passing the #200 sieve:1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/17/2014