Test 2019-09-25-13-2 (AASHTO T164-14) Summary

Project Information
Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date9/25/2019 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeQuality Control A brief description of the sample3/4inch HMA-SP RAP WMA PG 64-16
The quantity of what the sample constitutes1 From where was the sample collectedSource
First name of sampler or witnessed byMarina Last name of sampler or witnessed byKamel
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameSyar industry Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeReclaimed Asphalt Pavement RAP SourceStockpile@Plant
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
HMA Design ID JMF3512-2019-129-411101510-LB_0919
Test Details
DIME Sample ID: 2019-09-25-13
DIME Test ID: 2019-09-25-13-2
Testing Lab: CT HQ - Hot Mix Asphalt Laboratory
Test Method: AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)
Test Release Date: 2019-10-16
Test Results

Input Type: Calculated
Tester's full name: Lake Herman Lab
Date of test: 09/25/2019
Asphalt Binder Content:4.51 %
General comments (publicly viewable) (Max 250 characters): RAP Sample 3 T-164

Test was verified on 10/16/2019