Summary for Test 2018-11-28-10-1

Test performed: CTM 202-Oct 2014

Project Information

Project IdentifiersProject ID: 88888
DEA: SMTL-STOCK
EFIS: SMTL-STOCK
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date11/28/2018 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/04/2018
Sample typePer Request A brief description of the sample3 bags Washed and 3 bags Dry Fine Aggregate
The quantity of what the sample constitutesFine Aggregate From where was the sample collectedManufacturer
First name of sampler or witnessed byE Last name of sampler or witnessed byYip
Title of samplerMets Rep Telephone number of samplerUnknown
Laboratory sample identification18-0138 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameCoalinga Transportation Laboratory (TL) NumberC724452
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-10-0006
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedSierra Pacific Materials Avenal
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Sizefine
The concrete mix design numberUnknown Lot numberNot set
Sublot numberNot set Aggregate Mix NumberNot set
HMA PayNo

Test Details

DIME Sample ID: 2018-11-28-10
DIME Test ID: 2018-11-28-10-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 202-Oct 2014: Method of Test for Determining Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2018-12-20

Test Results


What size aggregate is being tested?: Fine Aggregate
Input Type: Calculated
Tester's full name: Bang Nguyen
Date of test: 12/20/2018
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 100 %
Cumulative percent passing the #8 sieve: 78 %
Cumulative percent passing the #16 sieve: 52 %
Cumulative percent passing the #30 sieve: 37 %
Cumulative percent passing the #50 sieve: 24 %
Cumulative percent passing the #100 sieve: 13 %
Cumulative percent passing the #200 sieve: 6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/20/2018