Summary for Test 2018-05-14-26-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212680
DEA: 024F5504
EFIS: 0213000005
DIST-CO-RTE-PM02-SIS-89-20.9 - 21.2
Award Date11/14/2017
Closeout Date05/15/2019
Work DescriptionBRIDGE REPLACEMENT WITH PRE-CAST I-GIRDER AND RECONSTRUCT HIGHWAY
Location DescriptionSISKIYOU COUNTY NEAR MCCLOUD FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF MUD CREEK BRIDGE
QA Service Level1 (Verified on 02/12/2018)

Sample Information

Sample Taken Date05/14/2018 Sample Unique Key26
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/14/2018
Sample typeVerification A brief description of the sample1/2-inch Type A HMA, PG 64-28 PM
The quantity of what the sample constitutesJMF Renewal From where was the sample collectedManufacturer
First name of sampler or witnessed byMichael Last name of sampler or witnessed byAllegretto
Title of samplerPEI Telephone number of samplerUnknown
Laboratory sample identificationD77365 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameTullis, Northstate Asphalt, Redding, CA Transportation Laboratory (TL) Number853534
Inspector Lot Number from the Transportation Laboratory (TL) FormJMF Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot numberNot set
Sublot numberNot set HMA Mix NumberNot set
HMA PayNo

Test Details

DIME Sample ID: 2018-05-14-26
DIME Test ID: 2018-05-14-26-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2018-07-10

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Colt Sweeny
Date of test: 05/15/2018
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.16 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/10/2018