Summary for Test 2018-05-14-26-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 212680 DEA: 024F5504 EFIS: 0213000005 |
---|---|
DIST-CO-RTE-PM | 02-SIS-89-20.9 - 21.2 |
Award Date | 11/14/2017 |
Closeout Date | 05/15/2019 |
Work Description | BRIDGE REPLACEMENT WITH PRE-CAST I-GIRDER AND RECONSTRUCT HIGHWAY |
Location Description | SISKIYOU COUNTY NEAR MCCLOUD FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF MUD CREEK BRIDGE |
QA Service Level | 1 (Verified on 02/12/2018) |
Sample Information
Sample Taken Date | 05/14/2018 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/14/2018 |
Sample type | Verification | A brief description of the sample | 1/2-inch Type A HMA, PG 64-28 PM |
The quantity of what the sample constitutes | JMF Renewal | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Michael | Last name of sampler or witnessed by | Allegretto |
Title of sampler | PEI | Telephone number of sampler | Unknown |
Laboratory sample identification | D77365 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Tullis, Northstate Asphalt, Redding, CA | Transportation Laboratory (TL) Number | 853534 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | JMF | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | Not set |
Sublot number | Not set | HMA Mix Number | Not set |
HMA Pay | No |
Test Details
DIME Sample ID: 2018-05-14-26
DIME Test ID: 2018-05-14-26-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2018-07-10
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Colt Sweeny
Date of test: 05/15/2018
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.16 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/10/2018 ✔