Test 2013-12-31-8258387-1 (ASTM C138-10b) Summary

Project Information
Project IdentifiersProject ID: 10016
DEA: 06342524
EFIS: 0600000381
DIST-CO-RTE-PM06-FRE-180-R71.8/74.5
Work DescriptionNEW EXPRESS HIGHWAY
Location DescriptionFRESNO COUNTY ABOUT 6.3 MILES EAST OF FRESNO FROM 0.6 MILE WEST OF QUALITY AVENUE TO 0.2 MILE WEST OF SMITH AVENUE
Sample Information
Sample Taken Date12/31/2013 Sample Unique Key8258387
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/31/2013
Sample typeQuality Control A brief description of the sampleType II Cement
The quantity of what the sample constitutes8 Cylinders From where was the sample collectedOther
First name of sampler or witnessed byJoshua Last name of sampler or witnessed byGuilmette
Title of samplerQC Field Technician/Inspector Laboratory sample identification2013-12-31-0825
The fabricator/manufacturer/facility nameBuilders Concrete Ready Mix Plant Sanger Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierLone Tree Canal Mainline Bridge Deck W/B
Structure nameLone Tree Canal Mainline Bridge Deck W/B
Material Information
Material TypeConcrete The concrete mix design numberND10530
The truck number from where the sample was collected9489 The batch plant ticket number from where the sample was collected111107855
Concrete batch plant1111 The fabricator/manufacturer designation for the samplePlant
A detailed description of where the material sample was collectedLone Tree Canal Mainline Bridge Deck W/B Where the material sample would have been placed if not sampledLone Tree Canal Mainline Bridge Deck W/B
From Lot No.Not set Bag Lot No.Not set
Test Details
DIME Sample ID: 2013-12-31-8258387
DIME Test ID: 2013-12-31-8258387-1
Testing Lab: Trinity Engineering Laboratories, Inc. - Fresno
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2014-02-18
Test Results

Input Type: Calculated
Tester's full name: Joshua Guilmette
Date of test: 12/31/2013
Identification of concrete represented by the sample: 2013-12-31-0825
Volume of the measure: 0.25 ft^3
Density of concrete:148.6 lb/ft^3
Yield of concrete:9.31 yd^3
Relative yield of the batch:0.98
Cement content:7.18 lb/ft^3
Air content:1.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 02/18/2014