Summary for Test 2023-06-23-34-3
Test performed: ASTM C39-18Project Information
Project Identifiers | Project ID: 993253 DEA: 033F0604 EFIS: 0312000052 |
---|---|
DIST-CO-RTE-PM | 03-GLE-162-76.3/78.6 |
Award Date | 02/02/2022 |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/08/2022) |
Sample Information
Sample Taken Date | 06/23/2023 | Sample Unique Key | 34 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/26/2023 |
Sample type | Department Acceptance | A brief description of the sample | Hinge 22- Long Girder End |
The quantity of what the sample constitutes | (9) 4 X 8 Cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Husam | Last name of sampler or witnessed by | Makhoul |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | 23-117 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Mathews Readymix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Butte City Bridge Br HWY 162 |
Material Information
Material Type | Concrete | The concrete mix design number | 07515P25 |
---|---|---|---|
The truck number from where the sample was collected | 719 | The batch plant ticket number from where the sample was collected | 365113 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Hinge 22-Long Girder End | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-06-23-34
DIME Test ID: 2023-06-23-34-3
Testing Lab: CT D03 - Chico Field Laboratory
Test Method: ASTM C39-18: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test results have not been published/verified or have not been released yet by the testing organization.
To make the test results available to others outside of your organization, a DIME organization manager for your organization must verify the results.