Test 2016-06-09-13-4 (ASTM C138-17a) Summary

Project Information
Project IdentifiersProject ID: 209141
DEA: 07215954
EFIS: 0700001835
DIST-CO-RTE-PM07-LA-5-0.0/7.6
Work DescriptionWIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location DescriptionLOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
Sample Information
Sample Taken Date6/9/2016 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing6/10/2016
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byMary Last name of sampler or witnessed byGreer
Title of samplerQC Field Technician Laboratory sample identificationSet 1
The fabricator/manufacturer/facility namejobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierUnknown
Structure nameUnknown
Material Information
Material TypeConcrete The concrete mix design numberS62578
The truck number from where the sample was collected459 The batch plant ticket number from where the sample was collected182116
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedAbut 1 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown
Test Details
DIME Sample ID: 2016-06-09-13
DIME Test ID: 2016-06-09-13-4
Testing Lab: G3 Quality, Inc. - Cerritos
Test Method: ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2017-01-13
Test Results

Input Type: Calculated
Tester's full name: Mary Greer
Date of test: 06/09/2016
Identification of concrete represented by the sample: Abut 1
Volume of the measure: 0.5 ft^3
Density of concrete:147 lb/ft^3
Yield of concrete:no data
Relative yield of the batch:no data
Cement content:no data
Air content:no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 01/13/2017