Test 2021-07-08-56-2 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 215656
DEA: 032G0604
EFIS: 0320000192
DIST-CO-RTE-PM03-SAC-5736-
Work DescriptionREMOVE AND REPLACE CL2 AGGREGATE BASE AND HMA (TYPE A).
Location DescriptionSACRAMENTO COUNTY IN SACRAMENTO AT THE NORTHGATE MAINTENANCE STATION AT 3940 ROSIN COURT
Sample Information
Sample Taken Date7/8/2021 Sample Unique Key56
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing9/1/2021
Sample typeVerification A brief description of the sample1/2" RAP
The quantity of what the sample constitutes2 bags From where was the sample collectedSupplier
First name of sampler or witnessed by? Last name of sampler or witnessed by?
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameGeorge Reed Drum Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeReclaimed Asphalt Pavement RAP SourceGeorge Reed Inc Clements Batch Plant, RAP
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
JMF Verification ID JMF3513-2021-79
Test Details
DIME Sample ID: 2021-07-08-56
DIME Test ID: 2021-07-08-56-2
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2021-09-24
Test Results

Input Type: Calculated
Tester's full name: George Reed Personnel
Date of test: 09/01/2021
Correction Factor (Percent by mass of HMA Specimen): no data
Asphalt Binder Content:5.45 %
General comments (publicly viewable) (Max 1000 characters): JMF 21-036

Test was verified on 09/24/2021