Project Information
Project IdentifiersProject ID: 215350
DEA: 081E0604
EFIS: 0813000140
DIST-CO-RTE-PM08-SBD-18-97.0/99.5
Work DescriptionWIDEN ROADWAY WITH HMA, MINOR CONCRETE & MODIFY SIGNAL & LIGHTING.
Location DescriptionSAN BERNARDINO COUNTY IN VICTORVILLE FROM AMARGOSA ROAD TO COBALT ROAD
Sample Information
Sample Taken Date8/16/2021 Sample Unique Key50
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/17/2021
Sample typeQuality Assurance A brief description of the sampletest 1 at 902 of 10cy out
The quantity of what the sample constitutes1 bag From where was the sample collectedManufacturer
First name of sampler or witnessed bydizhou Last name of sampler or witnessed byou
Title of samplertet Laboratory sample identificationtest 1 10 cy out
The fabricator/manufacturer/facility nameHi Grade - Oro Grande Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-36-0046
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedPlant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design numberct505f25 Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-08-16-50
DIME Test ID: 2021-08-16-50-2
Testing Lab: CT D08 - Barstow Field Testing Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2021-09-20
Test Results

What type of gradation is being tested?: Combined Gradation
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Input Type: Calculated
Tester's full name: dizhou ou
Date of test: 07/17/2021
Cumulative percent passing the 2 in. sieve:0 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:97 %
Cumulative percent passing the 3/4 in. sieve:79 %
Cumulative percent passing the 1/2 in. sieve:0 %
Cumulative percent passing the 3/8 in. sieve:23 %
Cumulative percent passing the #4 sieve:4 %
Cumulative percent passing the #8 sieve:1 %
Cumulative percent passing the #16 sieve:64 %
Cumulative percent passing the #30 sieve:46 %
Cumulative percent passing the #50 sieve:27 %
Cumulative percent passing the #100 sieve:11 %
Cumulative percent passing the #200 sieve:6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/20/2021