Test 2021-07-24-3-1 (AASHTO T30-19) Summary

Project Information
Project IdentifiersProject ID: 215350
DEA: 081E0604
EFIS: 0813000140
DIST-CO-RTE-PM08-SBD-18-97.0/99.5
Work DescriptionWIDEN ROADWAY WITH HMA, MINOR CONCRETE & MODIFY SIGNAL & LIGHTING.
Location DescriptionSAN BERNARDINO COUNTY IN VICTORVILLE FROM AMARGOSA ROAD TO COBALT ROAD
Sample Information
Sample Taken Date7/24/2021 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing7/24/2021
Sample typeQuality Assurance A brief description of the sample3/4" HMA-A-SP
The quantity of what the sample constitutes1 bag From where was the sample collectedManufacturer
First name of sampler or witnessed byJohn Last name of sampler or witnessed byB/D
Title of sampler Laboratory sample identificationat 727 am of 141 tons out sublot 2
The fabricator/manufacturer/facility nameBlue Diamond-Victorville Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-07-24-3
DIME Test ID: 2021-07-24-3-1
Testing Lab: CT D08 - Barstow Field Testing Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-09-13
Test Results

Does this test use 1/4 sieve?: Yes
Input Type: Calculated
Tester's full name: md taradfa
Date of test: 07/26/2021
Cumulative percent passing the 2 in. sieve:0 %
Cumulative percent passing the 1 1/2 in. sieve:0 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:98 %
Cumulative percent passing the 1/2 in. sieve:90 %
Cumulative percent passing the 3/8 in. sieve:77 %
Cumulative percent passing the 1/4 in. sieve:56 %
Cumulative percent passing the #4 sieve:46 %
Cumulative percent passing the #8 sieve:35 %
Cumulative percent passing the #16 sieve:25 %
Cumulative percent passing the #30 sieve:25 %
Cumulative percent passing the #50 sieve:15 %
Cumulative percent passing the #100 sieve:10 %
Cumulative percent passing the #200 sieve:4.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/13/2021