Test 2021-08-31-15-2 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 215494
DEA: 081H4904
EFIS: 0817000059
DIST-CO-RTE-PM08-SBD-18-31.9/38.5
Work DescriptionCOLD PLANE AC PAVEMENT AND OVERLAY WITH HMA (TYPE A).
Location DescriptionSAN BERNARDINO COUNTY FROM 0.1 MILE EAST OF HILLTOP CONNECTOR TO 0.5 MILE EAST OF SIBERIA CREEK TRAIL
Sample Information
Sample Taken Date8/31/2021 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing9/1/2021
Sample typeAcceptance A brief description of the sample3/4" HMA-A SP R12 0.75% LAS
The quantity of what the sample constitutes2 boxes 672.54 tons out From where was the sample collectedManufacturer
First name of sampler or witnessed byMatich Lytle Creek Last name of sampler or witnessed byQC
Title of sampler Laboratory sample identification0515A-21
The fabricator/manufacturer/facility nameMatich Lytle Creek Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-08-31-15
DIME Test ID: 2021-08-31-15-2
Testing Lab: CT - Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2021-09-09
Test Results

Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 09/02/2021
Correction Factor (Percent by mass of HMA Specimen): no data %
Asphalt Binder Content:4.68 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/09/2021