Summary for Test 2021-07-29-9-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215629 DEA: 060U0304 EFIS: 0615000184 |
---|---|
DIST-CO-RTE-PM | 06-FRE-33,198-24.3,22.7/22.9 |
Award Date | 05/07/2021 |
Closeout Date | 01/12/2023 |
Work Description | WIDEN INTERSECTION, PLACE LIGHTING, TRAFFIC MONITOR STATION & CULVERT. |
Location Description | FRESNO COUNTY NEAR COALINGA ON ROUTE 33 AT ROUTE 198 AND ON ROUTE 198 FROM 0.1 MILE SOUTH OF JUNCTION ROUTE 33/198 TO 0.1 MILE NORTH OF JUNCTION ROUTE 33/198 |
QA Service Level | 1 (Verified on 03/29/2021) |
Sample Information
Sample Taken Date | 07/29/2021 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/04/2021 |
Sample type | Acceptance | A brief description of the sample | BINDER |
The quantity of what the sample constitutes | 1 CAN | From where was the sample collected | Source |
First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | Graco |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Joaquin Refinery | Transportation Laboratory (TL) Number | 039911 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | Lot number | ||
Sublot number | Tank number | 32001 | |
Time of sample | HMA Supplier | Granite Construction | |
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-07-29-9
DIME Test ID: 2021-07-29-9-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-08-16
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 08/10/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 168.636 grams
Mass of empty container #2: 170.775 grams
Mass of container #1 before test (m1i): 204.040 grams
Mass of container #2 before test (m2i): 206.014 grams
Mass of container #1 after test (m1f): 204.040 grams
Mass of container #2 after test (m2f): 206.016 grams
Average mass change: 0.003 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 8/16/2021 ✔