Test 2021-05-21-32-2 (ASTM C143-20) Summary

Project Information
Project IdentifiersProject ID: 215126
DEA: 010G33U4
EFIS: 0120000002
DIST-CO-RTE-PM01-LAK-20-5.1/6.3
Work DescriptionWiden shoulders and replace bridge with box culvert.
Location DescriptionLAKE COUNTY NEAR UPPER LAKE FROM 0.4 MILE WEST OF WITTER SPRINGS ROAD TO 0.4 MILE EAST OF BACHELOR CREEK BRIDGE
Sample Information
Sample Taken Date5/21/2021 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing5/21/2021
Sample typeQuality Control A brief description of the sampleconc. cylinder
The quantity of what the sample constitutes2 From where was the sample collectedFabricator
First name of sampler or witnessed byDan Last name of sampler or witnessed byWeippert
Title of samplerQC Manager Laboratory sample identification
The fabricator/manufacturer/facility nameUniversal Precast Concrete Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeConcrete The concrete mix design numberPC65A0E2
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected61084
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedback of truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.
Test Details
DIME Sample ID: 2021-05-21-32
DIME Test ID: 2021-05-21-32-2
Testing Lab: Universal Precast Concrete
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2021-07-20
Test Results

Input Type: Calculated
Tester's full name: Mike Boak
Date of test: 05/21/2021
Slump: 8.75 inch
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 07/20/2021