Test 2021-06-15-31-1 (AASHTO T59-16) Summary

Project Information
Project IdentifiersProject ID: 213596
DEA: 051C8904
EFIS: 0513000009
DIST-CO-RTE-PM05-MON-101-87.3/R91.5
Work DescriptionPRECAST CONC PVMT, CRACK AND SEAT PAVEMENT AND RECONSTRUCT RAMPS.
Location DescriptionMONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD
Sample Information
Sample Taken Date6/15/2021 Sample Unique Key31
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing6/22/2021
Sample typeAcceptance A brief description of the sampleASPHALT EMULSION
The quantity of what the sample constitutes1 jug From where was the sample collectedJob Site
First name of sampler or witnessed byF Last name of sampler or witnessed byVEGA
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameREED and GRAHAM Transportation Laboratory (TL) Number683219
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphaltic Emulsion Emulsion GradeSS-1h
Lot NumberNot set Sub LotNot set
Test Details
DIME Sample ID: 2021-06-15-31
DIME Test ID: 2021-06-15-31-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T59-16: Standard Method of Test for Emulsified Asphalts (Emulsified Asphalt Residue Evap. (Sec. 7))
Test Release Date: 2021-06-24
Test Results

How many beakers will be used to conduct the test?: 4
Input Type: Measured
Tester's full name: Minoo Ahmadi
Date of test: 06/23/2021
Beaker 1 Mass of beaker, rod, screen (if used), and residue: 444.2 g
Beaker 1 Tare mass of the beaker, rod, and screen (if used): 414.4 g
Beaker 2 Mass of beaker, rod, screen (if used), and residue: 448.6 g
Beaker 2 Tare mass of the beaker, rod, and screen (if used): 418.4 g
Beaker 3 Mass of beaker, rod, screen (if used), and residue: 444.3 g
Beaker 3 Tare mass of the beaker, rod, and screen (if used): 414.0 g
Beaker 4 Mass of beaker, rod, screen (if used), and residue: 447.8 g
Beaker 4 Tare mass of the beaker, rod, and screen (if used): 418.0 g
Beaker 1 Residue: 59.6 %
Beaker 2 Residue: 60.4 %
Beaker 3 Residue: 60.6 %
Beaker 4 Residue: 59.6 %
Percentage of residue:60.0 %
General comments (publicly viewable) (Max 1000 characters): Per 2018 standard specifications

Test was verified on 06/24/2021