Test 2021-04-01-39-2 (AASHTO T51-13) Summary

Project Information
Project IdentifiersProject ID: 44444
DEA: ASCP
EFIS: ASCP
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Asphalt Supplier Certification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date4/1/2021 Sample Unique Key39
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing6/7/2021
Sample typeVerification A brief description of the samplePG64-16
The quantity of what the sample constitutes1 can From where was the sample collectedSource
First name of sampler or witnessed byNA Last name of sampler or witnessed byNA
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameMarathon - Mojave Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank number8
Time of sample HMA Supplier
Asphalt Binder SupplierMarathon Petroleum Co. LP - Mojave CA MultigradeYes
Multigrade TypeNot set JMF Verification ID
Test Details
DIME Sample ID: 2021-04-01-39
DIME Test ID: 2021-04-01-39-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2021-06-15
Test Results

Is a normal test obtainable?: Yes
Number of replicates tested: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 06/09/2021
Ductility of test #1 (D1): 120 cm
Ductility of test #2 (D2): 129 cm
Ductility of sample:125 cm
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs

Test was verified on 06/15/2021