Test 2021-05-07-6-6 (AASHTO T176-08) Summary

Project Information
Project IdentifiersProject ID: 215193
DEA: 07318804
EFIS: 0716000001
DIST-CO-RTE-PM07-LA-605-23.4/23.6
Work DescriptionREALIGN RAMP AND REPLACE GUARDRAIL WITH CONCRETE BARRIER.
Location DescriptionLOS ANGELES COUNTY IN IRWINDALE FROM 0.1 MILE NORTH OF GRAHAM ACCESS ROAD OVERCROSSING TO 0.1 MILE NORTH OF LIVE OAK AVENUE OVERCROSSING
Sample Information
Sample Taken Date5/7/2021 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing5/10/2021
Sample typeVerification A brief description of the samplePSUE 3/4" HMA-A-SP R15 No LAS
The quantity of what the sample constitutes4 Bags of Aggregate, 2 Bags of RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byZaid Last name of sampler or witnessed byAbdelkhaliq
Title of sampler Laboratory sample identification0270A-21
The fabricator/manufacturer/facility nameAll American Asphalt Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-33-0005
The fabricator's/manufacturer's product name for the sample3/4 HMA-A-SP R15 The fabricator/manufacturer designation for the sample
The plant number105793 A detailed description of where the material sample was collectedBelt Cut at All American Irwindale Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number JMF Verification ID
Test Details
DIME Sample ID: 2021-05-07-6
DIME Test ID: 2021-05-07-6-6
Testing Lab: CT - Southern Regional Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2021-05-17
Test Results

How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: Friday Ofoegbu
Date of test: 05/11/2021
Clay Level (Test 1): 5.7
Sand Level (Test 1): 3.9
Clay Level (Test 2): 5.5
Sand Level (Test 2): 3.7
Clay Level (Test 3): 5.9
Sand Level (Test 3): 4
Sand Equivalent (Test 1): 69
Sand Equivalent (Test 2): 68
Sand Equivalent (Test 3): 68
Sand Equivalent:69
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 05/17/2021