Test 2021-03-12-18-1 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 215307
DEA: 033F5004
EFIS: 0313000019
DIST-CO-RTE-PM03-GLE-5-R7.4/R17.0
Work DescriptionPLACE HMA (TYPE A) AND MODIFY INTERCONNECTION CONDUIT AND CABLE.
Location DescriptionGLENN COUNTY IN AND NEAR WILLOWS AT VARIOUS LOCATIONS FROM COUNTY ROAD 57 OVERCROSSING TO COUNTY ROAD 33 OVERCROSSING
Sample Information
Sample Taken Date3/12/2021 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing3/12/2021
Sample typeVerification A brief description of the sample3/4" HMA - A, with 15% RAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byBrad McKeehan (WITNESS) Last name of sampler or witnessed byKRC Personnel (SAMPLER)
Title of sampler Laboratory sample identificationJMF21-003
The fabricator/manufacturer/facility nameKnife River Construction - Orland Drum Plant Transportation Laboratory (TL) NumberC778174
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number JMF Verification ID JMF3513-2021-39
Test Details
DIME Sample ID: 2021-03-12-18
DIME Test ID: 2021-03-12-18-1
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2021-04-02
Test Results

Input Type: Calculated
Tester's full name: Terrance White
Date of test: 03/15/2021
Correction Factor (Percent by mass of HMA Specimen): no data
Asphalt Binder Content:5.00 %
General comments (publicly viewable) (Max 1000 characters): JMF21-003.

Test was verified on 04/02/2021