Print Report | Back to Test Summary

Testing Report for 2019-04-23-19-7

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214150 DEA: 080G8004 EFIS: 0812000111 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-38-47.50/59.40
Work Description: RELINE OR REPLACE CULVERTS
Location Description: SAN BERNARDINO COUNTY IN AND NEAR BIG BEAR LAKE AT VARIOUS LOCATIONS FROM ZACA ROAD TO BIG BEAR LAKE DAM
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-04-23-19
TL Number from the TL Form: C-8572
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Per Request
Type of Material: Soil
Sample Taken Date: 04/23/2019
Date that the sample was received by the laboratory/organization performing the testing: 04/24/2019
The quantity of what the sample constitutes: 1 bag
A brief description of the sample: Soil
From where was the sample collected: Job Site
Laboratory sample identification: 8572
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Caltrans

Material Information

The fabricator's/manufacturer's product name for the sample: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: SR-38 EB, PM 58.9
Where the material sample would have been placed if not sampled: Unknown

Test Information

DIME Test ID: 2019-04-23-19-6
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Verified Date: 05/30/2019
Date Tested: 05/02/2019
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Additional Comments When Verified:

Submitted Test Results

Cumulative percent passing the 3/8 in. sieve 96 %
Cumulative percent passing the #4 sieve 90 %
Cumulative percent passing the #8 sieve 75 %
Cumulative percent passing the #16 sieve 62 %
Cumulative percent passing the #30 sieve 49 %
Cumulative percent passing the #50 sieve 36 %
Cumulative percent passing the #100 sieve 23 %
Cumulative percent passing the #200 sieve 15 %