Testing Report for 2019-04-16-35-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214152 DEA: 120Q4204 EFIS: 1217000042 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-90-4.0
Work Description: MODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE PAVEMENT DELINEATION.
Location Description: ORANGE COUNTY IN BREA AT BERRY STREET
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Elie Najm Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-04-16-35
TL Number from the TL Form:
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Per Request
Type of Material: Soil
Sample Taken Date: 04/16/2019
Date that the sample was received by the laboratory/organization performing the testing: 04/18/2019
The quantity of what the sample constitutes: 1 ziplock bag
A brief description of the sample: Native Soil
From where was the sample collected: Job Site
Laboratory sample identification: 8553
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Caltrans

Material Information

The fabricator's/manufacturer's product name for the sample: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: Field, A-19-01
Where the material sample would have been placed if not sampled: Unknown

Test Information

DIME Test ID: 2019-04-16-35-1
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Verified Date: 05/30/2019
Date Tested: 04/22/2019
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Additional Comments When Verified:

Submitted Test Results

Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 98 %
Cumulative percent passing the 3/8 in. sieve 98 %
Cumulative percent passing the #4 sieve 97 %
Cumulative percent passing the #8 sieve 95 %