Summary for Test 2020-07-20-36-13
Test performed: AASHTO T315-16Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 07/20/2020 | Sample Unique Key | 36 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/03/2020 |
| Sample type | Department Acceptance | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 750 | From where was the sample collected | Source |
| First name of sampler or witnessed by | BRUCE | Last name of sampler or witnessed by | F. |
| Title of sampler | Consultant tester | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Dessert Creek | Transportation Laboratory (TL) Number | 993219 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-07-20-36
DIME Test ID: 2020-07-20-36-13
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2020-12-08
Test Results
Phase: PAV residue
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 12/08/2020
Test Plate Diameter: 8 mm
Test Gap: 2 mm
Test Frequency: 10.0 rad/s
Strain Amplitude: 1.00 %
Stress Amplitude: 24.077 kPa
Phase Angle (δ) (for the 10 cycles): 46.8 degree
Complex Modulus (G*) (for the 10 measurements): 2407.715 kPa
Test Temperature (Specimen 1): 16.0 C
(G*) x sin(δ)=: 1755 kPa
General comments (publicly viewable) (Max 1000 characters): Per Cal Trans 2018 Standards and Specifications
Test was verified on 12/8/2020 ✔
