Summary for Test 2020-09-17-30-5

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date09/17/2020 Sample Unique Key30
Date that the sample was received by the laboratory/organization performing the testing09/18/2020 Sample typeQuality Control
A brief description of the sample6x12 concrete cylinders The quantity of what the sample constitutes6
From where was the sample collectedJob Site First name of sampler or witnessed byAaron
Last name of sampler or witnessed byOerding Title of samplerQC Field Technician
Telephone number of samplerUnknown Laboratory sample identificationSet 1
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameJobsite
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifier00-0000 Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberG3-15-STR-002
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedRetaining Wall No 2, 736 Barrier, Truck no 1 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2020-09-17-30
DIME Test ID: 2020-09-17-30-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2020-12-04

Test Results


Input Type: Calculated
Tester's full name: Aaron Oerding
Date of test: 09/17/2020
Air Content: 1.6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/4/2020