Summary for Test 2020-06-30-56-1
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
| Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
| Award Date | 05/01/2019 |
| Closeout Date | 02/22/2024 |
| Work Description | Not set |
| Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
| QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
| Sample Taken Date | 06/30/2020 | Sample Unique Key | 56 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/01/2020 | Sample type | Verification |
| A brief description of the sample | 3/4 inch HMA-A, LL (intermediate) | The quantity of what the sample constitutes | JMF Verification |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | J. |
| Last name of sampler or witnessed by | Buscheck (WITNESS) | Title of sampler | Teichert Personnel |
| Telephone number of sampler | Laboratory sample identification | JMF20-037 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Teichert Perkins | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Perkins 1111 |
|---|---|---|---|
| Aggregate Size | Aggregate Source | Perkins 1111 | |
| RAP Stockpile | Continuous | Stockpile Size (tons) | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-30-56
DIME Test ID: 2020-06-30-56-1
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-12-02
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Kavon Rastegar
Date of test: 09/02/2020
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.33 %
General comments (publicly viewable) (Max 1000 characters): JMF20-037.
Test was verified on 12/2/2020 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
