Summary for Test 2020-04-14-51-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214492
DEA: 033F5404
EFIS: 0313000136
DIST-CO-RTE-PM03-SAC-99,160-4.5/5.7,R44.5
Award Date01/24/2020
Closeout Date07/28/2022
Work DescriptionFURNISH PRECAST PRESTRESSED CONCRETE SLAB & PLACE STRUCTURAL CONCRETE.
Location DescriptionSACRAMENTO COUNTY NEAR GALT ON ROUTE 99 FROM NORTH OF MINGO ROAD TO SOUTH OF ARNO ROAD OVERCROSSING AND IN SACRAMENTO ON ROUTE 160 AT AMERICAN RIVER BRIDGE
QA Service Level1 (Verified on 10/23/2019)

Sample Information

Sample Taken Date04/14/2020 Sample Unique Key51
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/15/2020
Sample typeVerification A brief description of the sample1/2 inch HMA - A (SP)
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byWalt Last name of sampler or witnessed byWylie (Witness)
Title of samplerTeichert Personnel Telephone number of sampler
Laboratory sample identificationJMF20-014 Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert Perkins Batch Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourcePerkins
Aggregate Size Aggregate SourcePerkins
RAP StockpileContinuous Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-04-14-51
DIME Test ID: 2020-04-14-51-3
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-11-25

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Terrance White
Date of test: 04/21/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 98 %
Cumulative percent passing the #4 sieve: 78 %
Cumulative percent passing the #8 sieve: 59 %
Cumulative percent passing the #16 sieve: 45 %
Cumulative percent passing the #30 sieve: 35 %
Cumulative percent passing the #50 sieve: 25 %
Cumulative percent passing the #100 sieve: 17 %
Cumulative percent passing the #200 sieve: 12.1 %
General comments (publicly viewable) (Max 1000 characters): JMF20-014

Test was verified on 11/25/2020