Summary for Test 2020-07-08-39-1
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
| Award Date | 05/27/2016 |
| Closeout Date | 08/01/2023 |
| Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
| Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
| QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
| Sample Taken Date | 07/08/2020 | Sample Unique Key | 39 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/09/2020 |
| Sample type | Quality Control | A brief description of the sample | Rock and Sand |
| The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Source |
| First name of sampler or witnessed by | Brenda | Last name of sampler or witnessed by | Amaya |
| Title of sampler | QC Field Technician | Telephone number of sampler | Unknown |
| Laboratory sample identification | Mix S62578 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Security Florance | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0027::CORONA QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Set 1 | The fabricator/manufacturer designation for the sample | Unknown |
| The plant number | Unknown | A detailed description of where the material sample was collected | Unknown |
| Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 1 inch |
| The concrete mix design number | S62578 | Lot number | 1 |
| Sublot number | 1 | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-07-08-39
DIME Test ID: 2020-07-08-39-1
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-11-18
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Alexis Balandra
Date of test: 07/10/2020
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 99 % | ||||||
| 86 % | ||||||
| 40 % | ||||||
| 17 % | ||||||
| 4 % | ||||||
| 2 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/18/2020 ✔
