Summary for Test 2020-11-09-9-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 213835
DEA: 051F7404
EFIS: 0514000049
DIST-CO-RTE-PM05-MON-101-R28.0/R30.6
Award Date04/03/2019
Closeout Date08/23/2021
Work DescriptionPLACE CONTINUOUSLY REINFORCED CONCRETE PAVEMENT ON EXISTING ROADWAY.
Location DescriptionMONTEREY COUNTY NEAR SAN LUCAS FROM 0.1 MILE SOUTH OF PARIS VALLEY ROAD OVERCROSSING TO RANCHO UNDERCROSSING
QA Service Level1 (Verified on 02/18/2019)

Sample Information

Sample Taken Date11/09/2020 Sample Unique Key9
Date that the sample was received by the laboratory/organization performing the testing11/10/2020 Sample typeDepartment Acceptance
A brief description of the sample3/4" HMA-A w/ RAP & LAS The quantity of what the sample constitutes1 box
From where was the sample collectedManufacturer First name of sampler or witnessed byLarry
Last name of sampler or witnessed byScott Title of sampler
Telephone number of sampler Laboratory sample identification20-A-284
Linked DIME Sample ID The fabricator/manufacturer/facility nameSierra Pacific Material-Coalinga
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number20 HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2020-11-09-9
DIME Test ID: 2020-11-09-9-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2020-11-10

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Eric Atkins
Date of test: 11/10/2020
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data g
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data %
Temperature Compensation Factor: no data
Test Temperature: no data F
Corrected Asphalt Binder Content: 5.03 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/10/2020 ✔