Summary for Test 2020-10-09-20-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 212501 DEA: 022E4804 EFIS: 0200000586 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-96,263-103.1/103.6,56.8/57.2 |
| Award Date | 12/14/2018 |
| Closeout Date | 12/01/2021 |
| Work Description | BRIDGE REPLACEMENT |
| Location Description | SISKIYOU COUNTY ABOUT 8 MILES NORTH OF YREKA ON ROUTE 96 FROM 0.5 MILE WEST TO 0.2 MILE EAST OF ROUTE 263 AND ON ROUTE 263 FROM 0.3 MILE NORTH OF SHASTA RIVER BRIDGE #02-0014 TO ROUTE 96 |
| QA Service Level | 1 (Verified on 06/06/2017) |
Sample Information
| Sample Taken Date | 10/09/2020 | Sample Unique Key | 20 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2020 |
| Sample type | Quality Assurance | A brief description of the sample | D250L Bar Lock |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | PETER | Last name of sampler or witnessed by | GAN |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Nucor Dayton Superior | Transportation Laboratory (TL) Number | C858378 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | Dayton Superior | Intermediate Assembler or Fabricator | |
| Rebar Size | #9 | Coupler Model | D250L Bar Lock |
| Coating Standards | ASTM A775 epoxy | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 172854 | Rebar Heat Number(s) | 1201025806 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2020-10-09-20
DIME Test ID: 2020-10-09-20-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-10-20
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 10/20/2020
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | No. 9/29mm | 1 | 0 | 1 | 96861 | 96861 | Service splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 10/20/2020 ✔
