Summary for Test 2020-09-25-16-3
Test performed: AASHTO T315-16
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
| Project Identifiers | Project ID: 55555 DEA: AMRL EFIS: AMRL |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for AASHTO Materials Reference Laboratory (AMRL). |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 09/25/2020 | Sample Unique Key | 16 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/30/2020 | Sample type | Proficiency |
| A brief description of the sample | Modified Asphalt Binder PG 64-28M | The quantity of what the sample constitutes | 1 can, Due October 25th |
| From where was the sample collected | Source | First name of sampler or witnessed by | Kevin |
| Last name of sampler or witnessed by | McKinney | Title of sampler | Oregon Cooperative Test Group |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | PNAC LLC, Marathon Petroleum | |
| Transportation Laboratory (TL) Number | 306 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2020-09-25-16
DIME Test ID: 2020-09-25-16-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2020-10-14
Test Results
Phase: Original binder
Input Type: Measured
Tester's full name: Eva Torres
Date of test: 10/14/2020
Test Plate Diameter: 25 mm
Test Gap: 1 mm
Test Frequency: 10.0 rad/s
Strain Amplitude: 12.00 %
Stress Amplitude: 0.162 kPa
Phase Angle (δ) (for the 10 cycles): 70.6 degree
Complex Modulus (G*) (for the 10 measurements): 1.354 kPa
Test Temperature (Specimen 1): 64.0 C
Dynamic Shear, G*/sin(δ): 1.44 kPa
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard and Specifications. test#2 Phase Angle = 70.5, G*/sin() = 1.4065 kPa
Test was verified on 10/14/2020 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
