Summary for Test 2020-09-16-18-2
Test performed: AASHTO T301-13Project Information
| Project Identifiers | Project ID: 214571 DEA: 020J1104 EFIS: 0219000062 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-33.1/42.1 |
| Award Date | 02/07/2020 |
| Closeout Date | 04/27/2021 |
| Work Description | PLACE HMA & SHOULDER BACKING, & REMOVE & REPLACE PAVEMENT DELINEATION. |
| Location Description | PLUMAS COUNTY AT AND NEAR KEDDIE FROM INDIAN CREEK BRIDGE TO 0.3 MILE WEST OF SPANISH CREEK BRIDGE NO. 09-0018 |
| QA Service Level | 1 (Verified on 01/22/2020) |
Sample Information
| Sample Taken Date | 09/16/2020 | Sample Unique Key | 18 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/28/2020 | Sample type | Department Acceptance |
| A brief description of the sample | Modified Asphalt Binder PG 64-28M | The quantity of what the sample constitutes | 1 Can, #10 test, #9(896936), #11(896938), #12(896939), #13(896940) NO TEST |
| From where was the sample collected | Source | First name of sampler or witnessed by | Derick |
| Last name of sampler or witnessed by | PEI | Title of sampler | PEI |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | western | |
| Transportation Laboratory (TL) Number | 896937 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | Not set | |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2020-09-16-18
DIME Test ID: 2020-09-16-18-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2020-10-09
Test Results
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/07/2020
Final Reading from the testing machine (X): 4 cm
% Elongation Recovery: 80 %
General comments (publicly viewable) (Max 1000 characters): per 2018 standard specs
Test was verified on 10/9/2020 ✔
