Summary for Test 2020-05-08-35-1

Test performed: AASHTO T164-14

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date05/08/2020 Sample Unique Key35
Date that the sample was received by the laboratory/organization performing the testing04/20/2020 Sample typeQuality Control
A brief description of the sampleT209 - 3 The quantity of what the sample constitutes2 Bags of RAP
From where was the sample collectedSource First name of sampler or witnessed byJordan
Last name of sampler or witnessed byBaker Title of sampler
Telephone number of sampler5302270982 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDeer Creek Rock and Asphalt
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceDeer Creek Rock and Asphalt
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-05-08-35
DIME Test ID: 2020-05-08-35-1
Testing Lab: Jaxon Enterprises - Deer Creek Rock & Asphalt
Test Method: AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)
Test Release Date: 2020-10-06

Test Results


Input Type: Calculated
Tester's full name: CGI Technician
Date of test: 05/08/2020
Corrected Asphalt Binder Content: 4.60 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/6/2020